RAALF

RAALF

Main menu

Skip to content
  • Announcements
  • Welcome
  • About Me
    • Curriculum Vitae
    • Teaching
  • Research
  • Research Talks
  • Publications
  • Students
    • Current Students
    • Past Students
  • Links
  • Contact

Ryerson engineering students and faculty renovate wind tunnel in Kerr Hall

Teh Eyeopener reports on the opening on November 19, 2015


Check out Ryersonian TV from November 19, a report on the wind tunnel by Ryersonian Science Reporter Rebecca Wood (see after minute 8).
Ryersonian


Kerr Hall spruces up Wind Tunnel

Page 3 of 3
« 1 2 3

Recent Posts

  • Students present at OSTIV Congress
  • 32-hours nonstop flight
  • 18-hour flight with CREATeV
  • CREATeV flies for over 10 hours using solar power
  • CREATeV flies again – with solar power for over 5 hours

Recent Comments

    Archives

    • June 2026
    • July 2022
    • April 2022
    • November 2020
    • November 2019
    • March 2019
    • September 2017
    • August 2017
    • December 2016
    • August 2016
    • February 2016
    • November 2015

    Categories

    • Announcements
    • Uncategorized

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org

    Copyright © 2026 RAALF. All Rights Reserved. The Magazine Basic Theme by bavotasan.com.